poiuytrewq0987
04-27-2010, 12:01 PM
Borisov said that the entire country will look differently if it could get about EUR 1 B; however, currently, the state can afford only to repair sections of up to 10-15 km.
The rehabilitation of the 15-km highway section was completed in 2 years; it cost BGN 4.8 M, most of which came from the European Regional Development Fund; 6 km of adjacent roads were also repaired under the project for a total of BGN 4.7 M.
http://novinite.com/view_news.php?id=115671
The rehabilitation of the 15-km highway section was completed in 2 years; it cost BGN 4.8 M, most of which came from the European Regional Development Fund; 6 km of adjacent roads were also repaired under the project for a total of BGN 4.7 M.
http://novinite.com/view_news.php?id=115671